City of Avenal Water Transmission Line Replacement Project (Project)

3 Documents in Project

Summary

SCH Number
2018031040
Lead Agency
Avenal, City of (City of Avenal)
Document Title
City of Avenal Water Transmission Line Replacement Project (Project)
Document Type
NOD - Notice of Determination
Received
Posted
10/5/2020

Document Description
The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board’s Drinking Water State Revolving Fund (SRF) Program is financing the Project. The Project includes construction of a four-mile 18-inch pipeline within the existing Right-of-Way (ROW) easement along State Route 269, between Interstate Highway 5 and Skyline Drive. The new pipeline will replace the existing deteriorated 12-inch pipeline at the same location. All materials and staging areas will be confined to the existing ROW easement.

Contact Information
Bridget Binning
State Water Resources Control Board
1001 I Street, 16th Floor
Sacramento, CA 95814

Phone : (916) 449-5641

Location

Cities
Avenal
Counties
Kings
Cross Streets
Interstate Highway 5 and Skyline Drive
State Highways
State Route 269

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
A record of financing approval for the Project is available to the general public at the State Water Board, Division of Financial Assistance at 1001 I Street, 16th Floor, Sacramento, CA 95814. The Mitigated Negative Declaration is available from the Lead Agency.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2018031040_City of Avenal Water Transmission Line Replacement   PDF 159 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print