Cuyama Community Services District Well No. 4 Replacement Project (Project)

3 Documents in Project

Summary

SCH Number
2018031032
Lead Agency
Cuyama Community Services District
Document Title
Cuyama Community Services District Well No. 4 Replacement Project (Project)
Document Type
NOD - Notice of Determination
Received
Posted
12/16/2019
Document Description
The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board's Drinking Water State Revolving Fund (SRF) Program is financing the Project. The Project includes adding a new well to the existing water system as a replacement for a well that was destroyed during a power failure and pump removal accident. The project also involves drilling an 18- inch minimum bore hole approximately 700 feet deep and installing an 8 inch well casing and screens with appropriate gravel pack. The well will be equipped with a submersible 325 gallons per minute pump and sand separator. The project will include a meter and apprutances at the well head and less than 100 feet of an 8-inch waterline connection, a variable frequency drive controller, and a replacement generator.

Contact Information

Name
Bridget Binning
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Cuyama
Counties
Santa Barbara
Cross Streets
4853 Primera Street, Cuyama, Santa Barbara County, CA

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print