Temescal Canyon Bridge and Road Realignment Project

3 Documents in Project

Summary

SCH Number
2018031021
Lead Agency
Lake Elsinore, City of (City of Lake Elsinore)
Document Title
Temescal Canyon Bridge and Road Realignment Project
Document Type
NOD - Notice of Determination
Received

Document Description
The City of Lake Elsinore, in coordination with Caltrans, is proposing to construct a new bridge over Temescal Wash in the City of Lake Elsinore, CA. There are two segments to the project which are as follows: Segment A includes the segment of roadway from 200 feet north of the proposed bridge to the existing 2-lane Temescale Canyon Road and would be built using local funds. Segment B includes the 4-lane, 375 foot long bridge and approx. 200 feet of the roadway, northwest of the bridge and 130 feet southeast of the bridge to be constructed using IIBP (federal) and local funding. The new bridge will connect to a 696 foot long realigned roadway that will extend from 200 feet south of the bridge to Lake Street approx. 180 feet south of the current intersection. The proposed bridge is 98 feet wide (with a curb to curb width of 80 feet), 375 feet long, and a structure depth of 5 feet. The project would include drainage improvements within Temescal Wash. The approx. total construction area of the project is 6.27 acres with an impervious area of approx. 3.0 acres (proposed roadway pavement, bridge, and concrete slope protection near the bridge abutment).

Contact Information
Richard J. Macl lott
City of Lake Elsinore
130 S. Main Street
Lake Elsinore, CA 92530

951-674-3124 x209

Location

Coordinates
33°43'46.45"N 117°24'0.0"W
Cities
Lake Elsinore
Counties
Riverside
Cross Streets
Temescal Canyon Rd, and Lake St
Zip
82530
Total Acres
3.24
Parcel #
varies
State Highways
I-15
Waterways
Temescal Creek
Township
5
Range
5
Section
15,16
Base
Alberhil

Notice of Determination

Approving Agency
Lake Elsinore
Approved On
Final EIR Available Location
130 S Main St., Lake Elsinore, CA 92530

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search