City of Ventura State Water Interconnection Project
4 Documents in Project
Summary
SCH Number
2018031010
Lead Agency
City of Ventura
Document Title
City of Ventura State Water Interconnection Project
Document Type
NOD - Notice of Determination
Received
Posted
8/12/2019
Document Description
The project would enable delivery of State Water Project (SWP) water by wheeling
water through the Metropolitan Water District of Southern California (MWD) and Calleguas Municipal Water District (Calleguas) water systems to the City of Ventura. The pipeline facilities (the "interconnection ") would also facilitate direct delivery of SWP water to United Water Conservation District (United) and direct or in-lieu delivery of SWP water to Casitas Municipal Water District (Casitas). In addition, the interconnection would allow the City to deliver water to Calleguas during an outage of Calleguas' imported water supplies. The interconnection would be a pipeline used to transport water between Calleguas' and the City's distribution systems.
Contact Information
Name
Betsy Cooper
Agency Name
City of San Buenaventura
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
City of San Buenaventura (City of Ventura)
Contact Types
Project Applicant
Location
Cities
Camarillo
Counties
Ventura
Other Location Info
The pipeline would be approximately 7 miles in length originating in the easterly portion of the City of Ventura (Henderson Road between South Saticoy Avenue and South Wells Road) and traversing southerly and easterly through unincorporated Ventura County to the southwestern end of the City of Camarillo (near the intersection of Camino Tierra Santa and Via Zamora).
Notice of Determination
Approving Agency
City of Ventura
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.