City of Ventura State Water Interconnection Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2018031010
- Lead Agency
- Ventura, City of (City of Ventura)
- Document Title
- City of Ventura State Water Interconnection Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 8/12/2019
- Project Applicant
- City of San Buenaventura (City of Ventura)
- Document Description
- The project would enable delivery of State Water Project (SWP) water by wheeling water through the Metropolitan Water District of Southern California (MWD) and Calleguas Municipal Water District (Calleguas) water systems to the City of Ventura. The pipeline facilities (the "interconnection ") would also facilitate direct delivery of SWP water to United Water Conservation District (United) and direct or in-lieu delivery of SWP water to Casitas Municipal Water District (Casitas). In addition, the interconnection would allow the City to deliver water to Calleguas during an outage of Calleguas' imported water supplies. The interconnection would be a pipeline used to transport water between Calleguas' and the City's distribution systems.
- Contact Information
-
Betsy Cooper
City of San Buenaventura
336 Sanjon Road
Ventura, CA 93001
Phone : (805) 654-7848
Location
- Cities
- Camarillo
- Counties
- Ventura
- Other Location Info
- The pipeline would be approximately 7 miles in length originating in the easterly portion of the City of Ventura (Henderson Road between South Saticoy Avenue and South Wells Road) and traversing southerly and easterly through unincorporated Ventura County to the southwestern end of the City of Camarillo (near the intersection of Camino Tierra Santa and Via Zamora).
Notice of Determination
- Approving Agency
- City of Ventura
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- City of Ventura , Ventura Water Department, 336 Sanjon Road , Ventura , CA 93001 Website: https://ca-ventura.civicplus.com/1081/6635/Library-of-Report
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- 2018031010 PDF 1181 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.