City of Ventura State Water Interconnection Project

3 Documents in Project

Summary

SCH Number
2018031010
Lead Agency
Ventura, City of (City of Ventura)
Document Title
City of Ventura State Water Interconnection Project
Document Type
NOD - Notice of Determination
Received
Posted
8/12/2019
Project Applicant
City of San Buenaventura (City of Ventura)

Document Description
The project would enable delivery of State Water Project (SWP) water by wheeling water through the Metropolitan Water District of Southern California (MWD) and Calleguas Municipal Water District (Calleguas) water systems to the City of Ventura. The pipeline facilities (the "interconnection ") would also facilitate direct delivery of SWP water to United Water Conservation District (United) and direct or in-lieu delivery of SWP water to Casitas Municipal Water District (Casitas). In addition, the interconnection would allow the City to deliver water to Calleguas during an outage of Calleguas' imported water supplies. The interconnection would be a pipeline used to transport water between Calleguas' and the City's distribution systems.

Contact Information
Betsy Cooper
City of San Buenaventura
336 Sanjon Road
Ventura, CA 93001

Phone : (805) 654-7848

Location

Cities
Camarillo
Counties
Ventura
Other Location Info
The pipeline would be approximately 7 miles in length originating in the easterly portion of the City of Ventura (Henderson Road between South Saticoy Avenue and South Wells Road) and traversing southerly and easterly through unincorporated Ventura County to the southwestern end of the City of Camarillo (near the intersection of Camino Tierra Santa and Via Zamora).

Notice of Determination

Approving Agency
City of Ventura
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
City of Ventura , Ventura Water Department, 336 Sanjon Road , Ventura , CA 93001 Website: https://ca-ventura.civicplus.com/1081/6635/Library-of-Report

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2018031010   PDF 1181 K
Download CSV New Search