SMUD Gas Pipeline Main Line Valve 2 Replacement Project

Summary

SCH Number
2018028368
Lead Agency
Sacramento Municipal Utility District
Document Title
SMUD Gas Pipeline Main Line Valve 2 Replacement Project
Document Type
NOE - Notice of Exemption
Received
Posted
2/23/2018

Document Description
SMUD contractors will replace one (1) main line valve on SMUD's high pressure natural gas pipeline. The proposed project consists of the following scope of work: 1. Excavate an existing, buried isolation serving a high pressure natural has transmission pipeline; 2. Hydrostatic testing will occur prior to installation of the new valve (approx. 550 gal) 3. remove the existing valve and replace with a new valve assembly. 4. New valve assembly includes: installation, start-up, adjustment, operation, and testing of the equipment provided. Furnished materials will include valve, pups, stem, actuator, line break system, controls, power gas tanks, and any incidentals for all equipment and underground installation. 5. Conduct testing and monitoring during re-pressurization of main line valve equipment. 6. Backfill with sand and native soil to preexisting conditions.

Contact Information
Ashlen McGinnis
Sacramento Municipal Utility District
P.O. Box 15830
Sacramento, CA 95852-0830

Phone : (916) 732-6775

Location

Counties
Yolo

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S: 21080, 21084,15302
Reasons for Exemption
Consists of "replacement or reconstruction of existing structures ns facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced".
Download CSV New Search