Veranda at River Oaks Project

2 Documents in Project

Summary

SCH Number
2018022063
Lead Agency
Galt, City of (City of Galt)
Document Title
Veranda at River Oaks Project
Document Type
NOD - Notice of Determination
Received

Document Description
Project consists of a 60 unit single family home subdivision on a 5.6 acre parcel. The density of the proposed project is 10.7 dwelling units per acre. The design features lots fronting common-use paseos with rear facing 2-car garages taking access from private alleyways. The subdivision will be served by a single public roadway with on-street parking. This primary access roadway provides access directly to Walnut Avenue to the south and Carillion Blvd. to the west. Each unit contains a front porch and front-facing living area with windows designed to provide eye's on the proposed common use landscaped paseos. Each unit is also provided a separated private yard area. The project includes four home plans, ranging in size from 1,452 sq. ft. Each unit in Veranda at River Oaks is provided with two parking spaces within its garage. Additional parking is provided via full on-street parking on the public street, as well as other on-site parklets.

Contact Information
Chris Erias
City of Galt
495 Industrial Drive
Galt, CA 95632

209-366-7200

Location

Coordinates
38°16'47.1"N 121°17'32.9"W
Cities
Galt
Counties
Sacramento
Cross Streets
Carillion Blvd and Walnut Ave
Zip
95632
Total Acres
5.59
Parcel #
148-0080-086
State Highways
99, 104
Railways
UPRR
Schools
Var
Waterways
Deadman Gulch, Laguna Creek
Township
5N
Range
6E
Section
14
Base
MDBM

Notice of Determination

Approving Agency
City of Galt
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
380 Civic Dr., Galt, CA 95632

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search