Golden State Water Company: Eaton Reservoirs & Retention Pond Project

2 Documents in Project

Summary

SCH Number
2018021057
Lead Agency
State Water Resources Control Board
Document Title
Golden State Water Company: Eaton Reservoirs & Retention Pond Project
Document Type
NOD - Notice of Determination
Received
Posted
6/8/2018
Present Land Use
Barstow, single fam res
Document Description
The SWRCB as the lead agency will be issuing a water supply permit for this Project. the Golden State Water Company proposes to install two new 0.6 million-gallon reservoirs, on a 46,250 foot squared pad, and a 270,000 gallon retention pond in the northwestern end of Barstow, wet of I-15, on undeveloped land. The retention pond will act to retain water in the event of a reservoir overflow. Installation will also include approx. 1,200 feet of 16-inchductile iron piping to connect the new reservoirs to the existing Eaton plant site, and approx. 325 feet of 12-inch of HDPE drain pipe will be laid to connect the reservoirs to the retention pond. Approx. 1,100 feet of 4 inch barbed wire fence and approx. 2,200 feet of 8-inch steel tube fencing will also be installed on the property. A Supervisory Control and Data Acquisition system will be installed. An approx. 15 foot by 500 foot paved access road will also be laid. The Project will provide for the operation of the system.

Contact Information

Name
Eric Zuniga
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Barstow
Counties
San Bernardino
Cross Streets
Eaton St and Tortoise Rd
Zip
92311
Total Acres
~2
State Highways
58, National Trails Hwy
Railways
BSF
Schools
3
Township
9N
Range
2W
Section
16
Base
1/4

Notice of Determination

Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print