Kern-Tulare Water District Resolution No. 2017-20 Interim Renewal CVP Water Service Contract, Contract No. 14-06-200-8601A-IR17 (3/1/2018-2/29/2020)

Summary

SCH Number
2018018383
Public Agency
Kern-Tulare Water District
Document Title
Kern-Tulare Water District Resolution No. 2017-20 Interim Renewal CVP Water Service Contract, Contract No. 14-06-200-8601A-IR17 (3/1/2018-2/29/2020)
Document Type
NOE - Notice of Exemption
Received
Posted
2/2/2018
Document Description
Project consists of Kern-Tulare Water District entering into an interim renewal water service contract with the U.S. for Central Valley Project water for the purpose of continuing delivery of CVP water within the boundaries of Kern-Tulare Water District if the District does not enter into a long-term renewal contract effective March 1, 2018. The District's original CVP water service contract was entered into on Nov. 30, 1976. The interim renewal CVP water service contract will be for a term of two years.

Contact Information

Name
Steven C. Dalke
Agency Name
Kern-Tulare Water District
Contact Types
Lead/Public Agency

Location

Counties
Kern, Tulare

Notice of Exemption

Exempt Status
Statutory Exemption
Type, Section or Code
S:15061(b)(3),15301,15313,15325
Reasons for Exemption
The project is not being proposed to be modified in a way that might have a new significant effect on the environment. The District's water distribution system will be operated within the range of operations contemplated under the District's original water service contract with the U.S. The most significant change resulting from the interim renewal contract is the changes in the pricing structure, over which the District has no discretion, and to the extent it did would be exempt pursuant to §15273(a). The Project is also exempt under section 15301 of the CA State CEQA Guidelines, which consists of the operation, repair, maintenance or minor alteration of existing public or private structures, facilities, mechanical equipment or topographical features, involving negligible or no expansion of use beyond that previously existing, including existing facilities providing public utility services. The project is the ongoing operation of the District's water distribution system to deliver CVP water under the terms of the interim renewal contract.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.