PHASE 1: Arden Way Mainline Extension/Replacement Project
Summary
- SCH Number
- 2018018236
- Public Agency
- Carmichael Water District
- Document Title
- PHASE 1: Arden Way Mainline Extension/Replacement Project
- Document Type
- NOE - Notice of Exemption
- Received
- Posted
- 1/18/2018
- Document Description
- This project will allow Carmichael Water District to abandon aging abestos cemet pipe infrastructure. Other distribution network improvements as a result of this project include creating a lopped system and improving fire flow. The project includes installation of approximately 2,100 linear feet of 8-inch DIP water main and replacement of 3 fire hydrants.
- Contact Information
-
Scott Bair
Carmichael Water District
Lead/Public Agency
7837 Fair Oaks Boulevard
Carmichael, CA 95608
Phone : (916) 483-2452
Location
- Counties
- Sacramento
- Cross Streets
- Arden Way between House Works Dr and McClaren Dr, Carmelo Dr, Gary Way
- Other Location Info
- Carmichael
Notice of Exemption
- Exempt Status
- Statutory Exemption
- Type, Section or Code
- 15282(k)
- Reasons for Exemption
- The project includes the installation of less than 1 mile of pipe in existing public right of way, therefore the project is statutorily exempt.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.