District Pipeline Replacement - 2018
Summary
SCH Number
2018018187
Public Agency
Truckee Donner Public Utility District
Document Title
District Pipeline Replacement - 2018
Document Type
NOE - Notice of Exemption
Received
Posted
1/11/2018
Document Description
Installation of approx. 2,300 feet of PVC or ductile iron pipeline to replace portions of existing steel pipelines. Installation of conduit and pull boxes at storage tank sites. Installation of about 8,000 feet of fiber innerduct inside inactive water pipelines.
Contact Information
Name
neil kaufman
Agency Name
Truckee Donner Public Utility District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Truckee
Counties
Nevada
Cross Streets
Baden Rd, Lausanne Way, Schussing Way, Skiview Loop and St. Bernard Dr, Innsbruck, Roundhill and
Other Information
Sitzmark tank sites in Tahoe Donner subdivision
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
S: 15302, 15304
Reasons for Exemption
Replacement of existing facilities with no increase in capacity. Minor trenching and backfilling with surface restoration.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.