Addendum to the U.S. 50/ Ponderosa Road/ South Shingle Road Interchange Improvements Project

2 Documents in Project

Summary

SCH Number
2018012042
Lead Agency
El Dorado County
Document Title
Addendum to the U.S. 50/ Ponderosa Road/ South Shingle Road Interchange Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
4/4/2025
Document Description
The project will improve the interchange at Ponderosa Road and South Shingle Road and realign frontage roads at Durock Road and North Shingle Road. The project will address an existing operations problem; improve Levels of Service (LOS); maintain adequate LOS for main-line operations and existing access points to and from Highway 50; improve multimodal mobility within and through the interchange; and, provide for future traffic growth, projected to occur from planned regional growth.

Contact Information

Name
Jon Balzer
Agency Name
El Dorado County Department of Transportation
Job Title
Senior Civil Engineer
Contact Types
Lead/Public Agency

Location

Cities
Unincorporated Shingle Springs
Counties
El Dorado
Regions
Northern California, Unincorporated
Other Location Info
Shingle Springs, CA

Notice of Determination

Approving Agency
El Dorado County
Approving Agency Role
Lead Agency
Approved On
County Clerk
El Dorado
Final Environmental Document Available at
https://www.eldoradocounty.ca.gov/Land-Use/Transportation/CEQA

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print