Jenny Lind Water Treatment Plant Pretreatment Improvements Project (CCWD CIP #11092, DR-4240-CA, PJ#0001)

2 Documents in Project

Summary

SCH Number
2018012034
Lead Agency
Calaveras County Water District (CCWD)
Document Title
Jenny Lind Water Treatment Plant Pretreatment Improvements Project (CCWD CIP #11092, DR-4240-CA, PJ#0001)
Document Type
NOD - Notice of Determination
Received
Posted
3/20/2018
Present Land Use
RR/PS/RR-1
Document Description
To address impacts to water quality, the District proposes to upgrade the Jenny Lind with a packaged pretreatment system, which consists of pre-engineered/pre-manufactured treatment units that will be fabricated off-site and shipped to the project site for final installation. The project will include demolition of existing metal building, construction of concrete foundations, a small gravity block retaining wall and minor drainage improvements, and installation of new process pumps, piping, polymer mixing/dosing systems, and electrical facilities, which are all necessary to complete the installation and for operation of the pretreatment unit.

Contact Information

Name
Charles Palmer
Agency Name
Calaveras County Water District
Contact Types
Lead/Public Agency

Location

Counties
Calaveras
Cross Streets
3516 Silver Rapids Rd
Zip
95249
Total Acres
8
Parcel #
072-044-003, -046-001, 002, 003
State Highways
26
Schools
Mountain Oaks, Calaveras River
Waterways
Cosgrove Crk, Calaveras River
Township
4N
Range
10E
Section
36
Base
MDBM
Other Location Info
Valley Springs/Rancho Calaveras

Notice of Determination

Approving Agency
Calaveras County Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No