2755 El Camino Real Multi-Family Residential Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2018012024
- Lead Agency
- City of Palo Alto
- Document Title
- 2755 El Camino Real Multi-Family Residential Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/6/2018
- Present Land Use
- parking lot/public facilities/major institution/special facilities
- Document Description
- The proposed project involves development of a four-story multi-family apartment building with up to 60 residential units. The building would be a max of 50 ft tall. 68 vehicular parking stalls would be provided on-site, with stalls located at ground level and in a subterranean garage with parking stackers. Including the subterranean garage space, the total gross size of the proposed project would be 39,220 sf. Garage access would be available via El Camino Real.
- Contact Information
-
Claire Hodgkins
City of Palo Alto
Lead/Public Agency
250 Hamilton Avenue, 6th Floor
Palo Alto, CA 94301
Phone : (650) 329-2116
Location
- Cities
- Palo Alto
- Counties
- Santa Clara
- Cross Streets
- El Camino Real and Page Mill Rd/Oregon Expressway
- Zip
- 94306
- Total Acres
- 0.449
- Parcel #
- 132-36-084
- State Highways
- SR82
- Railways
- Caltrain
- Schools
- Escondido ES
- Waterways
- Matadero Creek, Barron Creek
Notice of Determination
- Approving Agency
- Palo Alto City Council
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 250 Hamilton Ave., Ground Floor, Palo Alto, CA 94301
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.