San Francisco Bay Trail: Lone Tree Point - Rodeo
2 Documents in Project
Summary
SCH Number
2018012023
Lead Agency
East Bay Regional Parks District
Document Title
San Francisco Bay Trail: Lone Tree Point - Rodeo
Document Type
NOD - Notice of Determination
Received
Posted
11/1/2018
Present Land Use
parks and rec, commercial rec, water, new pacific properties specific plan area
Document Description
East Bay Regional Parks District proposes to open 0.5 miles of the SF Bay Trail along the San Pablo Bay shoreline between the Lone Tree Point parking lot in Rodeoand an existing segment of the Bay Trail in Hercules, CA. The proposed project would connect to an existing segment of the Bay Trail in the city of Hercules, which ends approx 1,000 ft northeast of Shoreline Park. The project also proposes to repave an existing paved shoreline access trail, or 'spur' trail which is approx 400 ft long. The spur trail begins at Pacific Ave and provides access to Lone Tree Point and San Pablo Bay.
Contact Information
Name
Jim Townsend
Agency Name
California Natural resources Agency
Contact Types
Lead/Public Agency
Address
Phone
Location
Coordinates
Cities
Hercules
Counties
Contra Costa
Cross Streets
Pacific Ave, Second St, San Pablo Ave
Zip
94572
Parcel #
357-371-001, -020-024, 404-030...etc.
State Highways
80
Railways
UPRR
Waterways
San Pablo Bay
Base
Mare Isl
Other Location Info
Rodeo
Notice of Determination
Approving Agency
California Natural Resources Agency
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.