Willow Creek Bridge on Carbondale Road Bridge Replacement Project

2 Documents in Project

Summary

SCH Number
2018012015
Lead Agency
Amador County
Document Title
Willow Creek Bridge on Carbondale Road Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
2/27/2018
Present Land Use
Carbondale Rd County ROW. Surrounding LU: Ag - G & Z: Exclusive ag district

Document Description
The proposed project would replace the existing bridge with a new structure accommodating two 11-ft wide lanes, 2-ft wide shoulders and bridge railings, resulting in an approx bridge width of 29 ft. The new bridge would consist of an 80-ft long two-span, cast in place, reinforced concrete slab supported on spread footings. The roadway alignment would remain unchanged. Along with a longer bridge, the roadway profile would be raised by approx 4 ft to provide required hydraulic capacity. The western roadway approach would begin approx 145 ft east of the Forest Home Rd/Carbondale Rd intersection, approx 400 ft west of the proposed bridge. The eastern approach would begin approx 560 ft east of the new bridge. Silver ROW acquisition would be required on south side of the road.

Contact Information
Jered Reinking
Amador County
810 Court St
Jackson, CA 95642-9534

Phone : (209) 223-6226

Location

Counties
Amador
Cross Streets
Carbondale Rd and Forest Home Rd
Other Location Info
Carbondale/Plymouth

Notice of Determination

Approving Agency
Amador County
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Amador County, 810 Court Street, Jackson, CA 95642

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes