Lathrop Wye and Track Extension Project (Streambed Alteration Agreement EPIMS Notification No. SJN-25436- R2)
12 Documents in Project
Summary
SCH Number
2018012014
Lead Agency
San Joaquin Regional Rail Commission
Document Title
Lathrop Wye and Track Extension Project (Streambed Alteration Agreement EPIMS Notification No. SJN-25436- R2)
Document Type
NOD - Notice of Determination
Received
Posted
7/26/2022
Document Description
The project is limited to the construction of a double barrel reinforced concrete box culvert in the French Camp Outlet Canal. The culvert structure will consist of a cast-in-place concrete box culvert structure within an earthen, man-made portion of the canal. The double-barrel concrete box culvert will be approximately 384 feet long, 30 feet wide, and 11 feet tall. Two concrete wing walls will be installed on each end of the culvert, each measuring approximately 20-feet long and 11-feet tall. Approximately 100 cubic yards of riprap will be placed at a depth of 5.5-feet around each end of the culvert. In is anticipated that all earthwork will be conducted using equipment staged on the bank.
Contact Information
Name
Dylan Wood
Agency Name
Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Coordinates
Cities
Manteca
Counties
San Joaquin
Regions
Northern California
Parcel #
198-011-070-000
Waterways
French Camp Outlet Canal
Other Location Info
approximately 0.45 miles northwest of the intersection of Villa Ticino Drive and W Louise Avenue.
Notice of Determination
Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
CDFWs regional office
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.