I-5 Fast Freight Corridor Route 5/99 Separation

4 Documents in Project

Summary

SCH Number
2018011052
Lead Agency
California Department of Transportation, District 6
Document Title
I-5 Fast Freight Corridor Route 5/99 Separation
Document Type
FIN - Final Document
Received
Present Land Use
exclusive ag, limited ag
Document Description
Note: Final can be located at: http://www.dot.ca.gov/dist6/environmental/envdocs/d6/ Caltrans proposes to improve the vertical clearance of the SR 99/I-5 separation bridge (Br. #50-0240R) to comply with the I-5 Freight Corridor standard. The work consists of lowering the profile of northbound SR 99 by approx 8 in and southbound SR 99 by approx one ft between PM L0.0 and 0.6. Two temporary lanes will be open to traffic for each direction of travel and the southbound truck route will remain open throughout construction.

Contact Information

Name
Richard Putler
Agency Name
California Department of Transportation, District 6
Contact Types
Lead/Public Agency

Location

Counties
Kern
Cross Streets
I-5, SR 99
Zip
93243
State Highways
I-5, SR 99
Waterways
CA Aqueduct, Tecuya Creek, Salt Creek, 850 Canal
Other Location Info
Wheeler Ridge

Notice of Completion

Development Types
Transportation:Other (standard vertical clearance)

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print