Operation of Irvine Ranch Water District - 3.7 MG Zone 1 Reservoir Project (Project)

3 Documents in Project

Summary

SCH Number
2018011030
Lead Agency
Irvine Ranch Water District
Document Title
Operation of Irvine Ranch Water District - 3.7 MG Zone 1 Reservoir Project (Project)
Document Type
NOD - Notice of Determination
Received
Posted
5/13/2020
Document Description
The District proposed Project includes construction of a 3.7-million-gallon reservoir adjacent to IRWD's existing 15-MG Zone 1 reservoir to serve existing District customers in the Irvine service area. The primary purpose of the Project is to construct an additional permanent reservoir to allow for storage reliability and operational flexibility in the zone 1 domestic water system. The Project would include construction of an above ground 3.7-MG pre-stressed circular concrete tank. Proposed reservoir construction and operation would also require installation of tank inlet and outlet piping, overflow piping, drainpipe, valve vault to house the inlet and outlet piping. One butterfly valve and roof hatches to allow for tank access. As part of the Project, the reservoir management system will be upgraded to accommodate the new reservoir tank. Additional site improvements will include new retaining walls, a relocated access road, a concrete gutter, and a motorized double-swing access gate at the site entry.

Contact Information

Name
Ashley Dummer
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Irvine
Counties
Orange
Cross Streets
southeast corner of Sand Canyon Ave and Elysian

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.