The Plunge Creek Conservation Project

2 Documents in Project

Summary

SCH Number
2018011024
Lead Agency
San Bernardino Valley Water Conservation District
Document Title
The Plunge Creek Conservation Project
Document Type
NOD - Notice of Determination
Received
Posted
2/28/2018
Present Land Use
ag/equestrian residential

Document Description
Project consists of excavating two pilot channels from the active channel of Plunge Creek, through the historic floodplain, and back to the active channel, with the primary goals of: 1) increasing the area of suitable habitat sensitive and listed species; and 2) increasing groundwater recharge opportunities without increasing the risk of flooding or erosion on non-District owned or managed land. The duration of the project is approx. 1 month. The Project is specifically identified in the Upper Santa Ana River Wash Habitat Conservation Plan, as the Plunge Creek Habitat Enhancement.

Contact Information
Daniel Cozad
San Bernardino Valley Water Conservation District
1630 W. Redlands Blvd
Redlands, CA 92373

Phone : (909) 793-2503

Location

Coordinates
34°6'17"N 117°9'31"W
Cities
Highland
Counties
San Bernardino
Cross Streets
Abbey Way
Total Acres
3.5
State Highways
SR 210
Airports
Redlands Municipal
Schools
Beattie MS
Waterways
Plunge Creek
Township
1S
Range
3W
Section
21
Base
SBBM

Notice of Determination

Approving Agency
San Bernardino Valley Water Conservation District
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
1630 W. Redlands Blvd., Redlands, CA 92373

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search