Mecca II Landfill Closure and Post-Closure Maintenance Project

2 Documents in Project

Summary

SCH Number
2018011010
Lead Agency
Riverside County
Document Title
Mecca II Landfill Closure and Post-Closure Maintenance Project
Document Type
NOD - Notice of Determination
Received
Posted
3/20/2018
Present Land Use
existing landfill/controlled development; watercourse watershed conservation area/public facilities

Document Description
The Mecca II Landfill is open only two days per year. As the landfill is nearing its disposal capacity, the RCDWR is preparing for the closure and post-closure maintenance of the Mecca II facility. The proposed project involves two phases: phase 1 involves activities associated with the closure of the landfill; excavation and grading for the construction of the final cover, placement of erosion control materials, and construction of drainage structures. Phase 2 involves the post-closure maintenance, monitoring, and enhancements of the landfill's environmental systems.

Contact Information
Jose Merlan
Riverside County
14310 Frederick St
Moreno Valley, CA 92553

Phone : (951) 486-3200

Location

Coordinates
33°34'15.99"N 116°00'08.53"W
Counties
Riverside
Cross Streets
66th Ave and Garfield St
Parcel #
727-241-001, -242-001, et al
State Highways
111
Waterways
Coachella Valley Canal
Township
7S
Range
9E
Section
12
Base
SBBM
Other Location Info
Mecca

Notice of Determination

Approving Agency
Riverside County
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
14310 Frederick STreet, Moreno Valley, CA 92553

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search