Jefferson Leadership Academies HVAC Project

Summary

SCH Number
2017128336
Public Agency
Long Beach Unified School District
Document Title
Jefferson Leadership Academies HVAC Project
Document Type
NOE - Notice of Exemption
Received
Posted
12/13/2017
Document Description
LBUSD proposes campus improvements to Jefferson Leadership Academies including the installation of: new HVAC systems with a new instrumentation and controls system, upgraded electrical systems, ADA-compliant access improvements, new drop ceilings in various classrooms, a campus wide fire alarm, digital intercom/clock and bell system upgraded, and the replacement of the turf play field with synthetic turf. Other improvements to the buildings and paint finished. The proposed project only involves the renovation of existing buildings and limited site work related to modifying ramps and pavement for ADA compliance. The project would have no effect on the capacity of the school. Construction activities are anticipated to start in August 2018, and the overall construction duration is anticipated to last approx 12 months. The project would benefit the staff and students at the school.

Contact Information

Name
Alan Reising
Agency Name
Long Beach Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Long Beach
Counties
Los Angeles

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301 c1, 15302 c2
Reasons for Exemption
The proposed project consists of repairs, upgrades and minor alteration of existing buildings to provide HVAC system; fire, life, safety; floor and paint finishes; ceilings, and accessibility improvements. The project does not increase student capacity of the school and does not increase the sf of the building. The project would remove the HVAC systems in buildings 100-700 and replace with a new system. Also the project would replace the existing turf field synthetic turf. All upgraded buildings and the field on the Jefferson campus will have the same purpose and capacity as the currently conditions.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print