High Performance, Ultra-Tall, Low Cost Concrete Wind Turbine Towers Additively Manufactured On-Site
Summary
- SCH Number
- 2017128333
- Lead Agency
- Energy Commission (California Energy Commission)
- Document Title
- High Performance, Ultra-Tall, Low Cost Concrete Wind Turbine Towers Additively Manufactured On-Site
- Document Type
- NOE - Notice of Exemption
- Received
- Posted
- 12/13/2017
- Document Description
- The purpose of this agreement is to develop, demonstrate, and test a reinforced concrete additive manufacturing technology for building low cost ultra-tall wind turbine towers onsite at the wind plant. The proposed reinforced concrete additive manufacturing technology eliminates the transportation and logistics constraints by manufacturing structurally efficient large diameter towers within the wind plant using lights weight reinforcement methods. The towers are made with locally available cementitious materials supplied by standard concrete trucks or an existing concrete batch plant within the wind plant used for casting conventional tower foundations. The construction tech will reduce technological and economic barriers to upgrading, repowering, and expanding wind power generation in CA by enabling cost effective deployment of taller towers that capture more wind energy from faster winds aloft.
- Contact Information
-
Silvia Palma-Rojas
California Energy Commission
1516 Ninth Street, MS-48
Sacramento, CA 95814
Phone : (916) 327-1716
Location
- Cities
- Irvine
- Counties
- Orange
Notice of Exemption
- Exempt Status
- Categorical Exemption
- Type, Section or Code
- 15306
- Reasons for Exemption
- Class 6 consists of basic data collection, research, experimental management, and resource evaluation activities which do no result in a serious or major disturbance to an environmental resource. The project involves design studies, engineering analyses, and economic analyses of conrete wind turbine tower designs. Prototype concrete tower sections will be fabricated using a robotic arm and 3D printer, and will then be tested at the civil engineering lab of UC, Irvine.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.