Regional Water Quality Control Plant New Outfall Project

3 Documents in Project

Summary

SCH Number
2017122060
Lead Agency
City of Palo Alto
Document Title
Regional Water Quality Control Plant New Outfall Project
Document Type
NOD - Notice of Determination
Received
Posted
2/4/2019
Present Land Use
major institutional/special fac, publicly owned conservation land, public facilities/site and design review district
Document Description
The proposed project would install a new effluent outfall pipe, rehabilitate the existing outfall pipe, and replace the Renzel Marsh pump. The new effluent outfall pipe would extend approx 2,402 lf, starting at the Water Quality Control Plant and ending immediately adjacent to the existing outfall pipe's discharge point. Installation of the new effluent outfall pipe would require open trenching and backfilling. The existing outfall pipe would be rehabilitated with flexible joint seals and no open excavation would be required as construction workers would enter the pipe to install these repairs. A new pump would be installed to replace the existing pump that conveys treated water the Renzel Marsh in order to improve efficiency. The State Lands Commission is an amendment of a 45-year General Lease - Public Agency through August 14, 2059

Contact Information

Name
Dobri Tutov
Agency Name
California State Lands Commission
Contact Types
Lead/Public Agency

Location

Cities
Palo Alto
Counties
Santa Clara
Cross Streets
2501 Embarcadero Rd, San Fracisquito Creek Trail
Zip
94303
Total Acres
0.5linear mi
Parcel #
008-03-029
State Highways
101
Airports
Palo Alto
Schools
Duveneck, Jordan, Ohle
Waterways
SF Bay, Bayfield Slough, San Francisquito Creek
Section
public

Notice of Determination

Approving Agency
CA State Lands Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print