Sacramento River West Bank Seepage Mitigation Project, Levee Miles 3.41 to 6.45

4 Documents in Project

Summary

SCH Number
2017122058
Lead Agency
Sacramento River West Side Levee District
Document Title
Sacramento River West Bank Seepage Mitigation Project, Levee Miles 3.41 to 6.45
Document Type
NOD - Notice of Determination
Received
Posted
3/6/2018
Present Land Use
ag intensive

Document Description
The proposed project consists of constructing approx 3.25 mi of permanent drained seepage berm over several construction seasons along the landside toe of the Sacramento River west levee. The proposed project would be constructed in response to seepage that occurs periodically along the levee toe during high water events in the Sacramento River and to prevent future seepage problems along the levee, both of which could lead to levee failure. DWR had previously identified the levee reach in their non-urban levee evaluation program as a critical repair site needing immediate attention and prioritized the area for repair by including it in their flood system repair program.

Contact Information
Meegan Nagy
Sacramento River West Side Levee District
975 Wilson Bend Road
Grimes, CA 95950

Phone : (530) 812-6269

Location

Coordinates
38°50'50"N 121°43'48"W
Counties
Yolo
Cross Streets
Road 108 and SR 45
Zip
95776
Total Acres
43
Parcel #
056-030-02
State Highways
SR 45
Waterways
Sacramento River
Township
12N
Range
2E
Section
34
Other Location Info
Knights Landing

Notice of Determination

Approving Agency
Sacramento River West Side Levee District
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
975 WIlson Bed Road, P.O. box 50, Grimes, CA 95950

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No