Healdsburg High School Track and Field Improvements and Gymnasium Expansion

2 Documents in Project

Summary

SCH Number
2017122021
Lead Agency
Healdsburg Unified School District
Document Title
Healdsburg High School Track and Field Improvements and Gymnasium Expansion
Document Type
NOD - Notice of Determination
Received
Posted
2/27/2018
Present Land Use
GP: Public/quasi public; Z: P-public

Document Description
A new gymnasium and locker room should be attached to the existing gym of Healdsburg High School in an area previously used for portable buildings. Daily and seasonal usage of the gym would be unchanged from existing conditions. The track and field improvements would keep the track in its current location but provide new track surfacing and reorient the finish line from the southeast corner of the track to the northwest corner. Emergency vehicle access would be provided on the west side if the field. The football/soccer field set in the center of the track would be synthetic turf with shock pad, soil isolation fabric, compacted leveling course, a sub drain system..

Contact Information
Glen Schaezlein
Healdsburg Unified School District
1028 Prince Ave
Healdsburg, CA 95448

Phone : (707) 362-1118

Location

Coordinates
38°37'"N 122°52'45"W
Cities
Healdsburg
Counties
Sonoma
Cross Streets
Prince Ave, University Ave, Monte Vista Ave
Zip
95448
Total Acres
27
Parcel #
002-421-002-000
State Highways
101
Schools
Healdsburg MS, Fitch Mountain ES

Notice of Determination

Approving Agency
Healdsburg Unified School District
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
http://www.husd.com

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search