1431 El Camino Real - New Three-Story, Six Unit Condominium Building

2 Documents in Project

Summary

SCH Number
2017122013
Lead Agency
City of Burlingame
Document Title
1431 El Camino Real - New Three-Story, Six Unit Condominium Building
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2018
Present Land Use
R-3 medium high density res
Document Description
The proposed 1431 El Camino Real project would include demolition of an existing two-story apartment building with a detached five-car garage structure at the rear, and construction of a 3,858 sq. ft. six-unit, three-story (35 feet tall) residential building in its place. Each unit would be two bedrooms and 2.5 bathrooms, ranging in size from 1,004 sq. ft. to 1,195 sq. ft. All entrances to the units would be located on the north-facing (driveway) side of the project site. The application includes a request for a Condominium Permit, Design Review, and Parking Variance for the use of mechanical parking lifts.

Contact Information

Name
William Meeker
Agency Name
City of Burlingame
Contact Types
Lead/Public Agency

Location

Cities
Burlingame
Counties
San Mateo
Cross Streets
El Camino Real and Mills Ave
Zip
94010
Total Acres
0.18
Parcel #
026-013-110
State Highways
82
Railways
Caltrain
Schools
Lincoln ES
Waterways
Mills Creek, Easton Creek, San Andreas Lake, San Fra

Notice of Determination

Approving Agency
City of Burlingame
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.