Eastside Bypass Improvements Project (California Endangered Species Act Incidental Take Permit No. 2081-2018-067-04 (ITP))

6 Documents in Project

Summary

SCH Number
2017121026
Lead Agency
California Department of Water Resources (DWR)
Document Title
Eastside Bypass Improvements Project (California Endangered Species Act Incidental Take Permit No. 2081-2018-067-04 (ITP))
Document Type
NOD - Notice of Determination
Received
Posted
6/13/2019
Document Description
The proposed Project consists of modification of Eastside Bypass Levees (Reaches 0-1, 0-3, and 0-4) to reinforce approximately 2 mile of existing levee along the Eastside Bypass between Sand Slough and the Mariposa Bypass over 41.4 acres and the Eastside Bypass Control Structure to improve fish passage and construct a rock ramp downstream that would provide a fishway entrance over 6.2 acres. See NOD for full details.

Contact Information

Name
Jim Vang
Agency Name
California Department of Fish and Wildlife (CDFW) Region 4
Contact Types
Lead/Public Agency

Location

Cities
Los Banos, Merced
Counties
Merced
Other Location Info
The Project is located between the cities of Merced and Los Banos in Merced County in the Eastside Bypass, just east of the San Joaquin River. The proposed Project area include the Eastside Bypass between the Sand Slough Control Structure and the Mariposa Bypass, and is located within the United States Geological Survey (USGS) 7.5-minute Turner Ranch, Sandy Mush, and Santa Rita Bridge quadrangles.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print