Operation of Warner Springs Estates, Well 8 Iron and Manganese Treatment.

Summary

SCH Number
2017118311
Lead Agency
State Water Resources Control Board
Document Title
Operation of Warner Springs Estates, Well 8 Iron and Manganese Treatment.
Document Type
NOE - Notice of Exemption
Received

Document Description
The State Water Resources Control Board (State Water Board) as the lead agency will be issuing a water supply permit for the operation of Well 8, which was drilled in 2004. On September 15, 2017, Warner Springs Estates completed installation of an iron and manganese treatment filtration system and associated mechanical controls, including construction of a 12x16 foot building to house the filter, and a 1,200 foot transmission pipeline to convey water from the filter to the distribution system. The project will provide for the operation of these facilities.

Contact Information
Sean Sterchi
State Water Resources Control Board
San Diego District Office 1350 Front Street
San Diego, CA 92101

(619) 525-4159

Location

Counties
San Diego
State Highways
SR 79
Other Location Info
Pinyon, Warner Springs

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 1 - S: 15301, S: 60101
Reasons for Exemption
This project consists of the operation and of existing private structures involving no expansion of use beyond that existing at the time of the lead agency's determination. Pursuant to the California Fish and Wildlife Code, Section 711.4(d)(1), the CDFW environmental review filing fees do not apply.
Download CSV New Search