Mare Island Storm Drain Pipe Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2016-0275-R3)
Summary
SCH Number
2017118059
Public Agency
California Department of Fish and Wildlife, Region 3
(CDFW)
Document Title
Mare Island Storm Drain Pipe Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2016-0275-R3)
Document Type
NOE - Notice of Exemption
Received
Posted
11/3/2017
Document Description
The project is limited to the replacement of a 30-inch diameter corrugated metal pipe wih one 30-inch High Density Polyethylene pipe. The replacement pipe will be approximately 50 feet south of the existing pipe. Approximately 0.031 acres of temporary impacts and 0.038 acres of permanent impacts will occur to Northern Coast Salt Marsh (NCSM) and mudflat communities, because of the project.
Contact Information
Name
Garrett Allen
Agency Name
California Department of Fish and Wildlife, Region 3
Contact Types
Lead/Public Agency
Phone
Location
Cities
Vallejo
Counties
Solano
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15302, Class 2
Reasons for Exemption
The project involves the replacement of a storm drain pipe with one in-kind to the existing pipe.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.