Document Description
Due to safety, nuisance, and facility-age concerns, CAL FIRE is proposing a new helitack base outside of the community of Bieber. The new helitack base would have crew housing facilities designed to meet Silver LEED rating criteria, would provide quality-of-life upgrades for the permanent and seasonal crews stationed at the helitack base, and would increase safety parameters and decrease nuisance impacts to the surrounding community. No plans have been made for the use of the existing Station. It is anticipated that the station would be declared as surplus and vacated. The existing site is owned in part by Lassen County (northern 1/3 portion of site) and the State of CA (southern 2/3 of the site). The proposed project would involve the relocation and replacement of the existing Bieber Fire Station and Heltiack Base located at 510 Bridge Street, Bieber CA. Project involve design and construction of a new fire station and helitack base complex. The proposed project would also include site preparation, utility extension and connections, water well, pipelines and 180,000 gallon water storage tank and possible backup storage, septic system, above-ground vehicle fuel storage, propane tank and lines, sustainable design storm water management features, security fencing, and all necessary appurtenances including driveways and interior roads. An overflow parking area is proposed in the southeastern corner of the complex to accommodate increased staff and equipment during a major fire event.

Contact Information
Patricia Kelly
Cal Fire
21080 Harvard St., Suite 200
Sacramento, CA 95815

916-376-1609

Location

Coordinates
41°07'22"N 120°59'40"W
Counties
Lassen
Cross Streets
Susanville Rd and Plumb Lane
Total Acres
80
Parcel #
003-100-49-11
Township
38N
Range
8E
Section
24
Base
MDM
Other Location Info
Bieber

Notice of Determination

Approving Agency
CALFIRE
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
2180 Harvard ST., Suite 200, Sacramento, CA 95815

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA