PV Peninsula Water Reliability (Lake or Streambed Alteration Agreement No. 1600-2017-0259-R5

2 Documents in Project

Summary

SCH Number
2017111090
Lead Agency
City of Rolling Hills Estates
Document Title
PV Peninsula Water Reliability (Lake or Streambed Alteration Agreement No. 1600-2017-0259-R5
Document Type
NOD - Notice of Determination
Received
Posted
4/17/2018
Present Land Use
GP: Varies Z: Varies
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0259-R5, pursuant to section 1602 of the Fish and Game Code to the project Applicant, CA Water Service. The project will consist of installing approx. 7 miles of 24 inch and 30 inch buried potable water pipeline and building a new pump station, as well as road improvements to an existing access road and a slope erosion improvements at Dapplegray Elementary School. The pipeline alignment consists of temporary impacts, the majority of which are within existing paved roadways along Palos Verdes Drive North and Crenshaw Blvd., and within existing dirt trails. Of the 55.39 acres of total project area, the only impacts that will occur to native habitat are 0.07 acre of permanent impacts to lemonade berry scrub and 0.05 acre of temporary impact to red willow ticket.

Contact Information

Name
Brock Warmuth
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Rancho Palos Verdes, Rolling Hills Estates
Counties
Los Angeles
Cross Streets
Crenshaw Blvd/Palos Verdes Dr N
Zip
90274
Parcel #
numerous
State Highways
SR 1, 107, 213
Railways
Metrolink
Schools
Various

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No