Addendum to the Final ND for the Proposed Improvements Project at the Biola WWTP

5 Documents in Project

Summary

SCH Number
2017111058
Lead Agency
Biola Community Services District (BCSD)
Document Title
Addendum to the Final ND for the Proposed Improvements Project at the Biola WWTP
Document Type
NOD - Notice of Determination
Received
Posted
12/28/2018
Present Land Use
Existing WWTP/Fresno County GP: AL-20 Limited ag/Z: AL-20 Limited ag
Document Description
The Biola CSD intends to construct an extended aeration activated sludge system that will allow the WWTP to produce effluent with a quality that meets existing limits and, if desired, will be suitable for groundwater recharge and/or other beneficial use. Upgrades include modifications/improvements to various ponds, clarifiers, drying beds, mixer units, pumps, pipelines, and related improvements within the WWTP boundaries. Construction is anticipated to start in February 2019 and finish in February 2020. After filing the original Notice of determination, minor changes were made to the project which included the construction and operation of three monitoring wells. The environmental impacts of thoese three wells was analyzed in the addendum.

Contact Information

Name
Elaine Cervantes
Agency Name
Biola Community Services District
Contact Types
Lead/Public Agency

Location

Counties
Fresno
Cross Streets
west side of Howard Ave, 0.5 miles south of Shaw Ave
Zip
93606
Total Acres
13.8
Schools
Biola ES
Waterways
Various canals
Township
13S
Range
18E
Section
17
Base
MDBM
Other Location Info
Biola

Notice of Determination

Approving Agency
Biola Community Services District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print