Sherman Oaks Center for Enriched Studies (SOCES) Comprehensive Modernization

3 Documents in Project

Summary

SCH Number
2017111008
Lead Agency
Los Angeles Unified School District
Document Title
Sherman Oaks Center for Enriched Studies (SOCES) Comprehensive Modernization
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed project includes the construction of new classrooms, support spaces, a gymnasium, and a lunch shelter. The proposed project also includes improvements to existing school facilities. The proposed project also includes the demolition of seven portable structures and six permanent buildings, including the gymnasium building, transportation building, and four classroom buildings (#5, 7, 9, and 10), and one permanent structure, the lunch shelter. The auditorium building will be modernized and seismically retrofitted, and the existing administrative and counseling buildings will be upgraded and reconfigured. All existing buildings will be upgraded with new exterior paint and programmatic access improvements. Further, existing classrooms and adjacent interior corridors will also be upgraded with new interior paint, improvements to flooring systems, and upgraded permanent classroom fixtures. Finally, upgrades to the site infrastructure and utilities and various site-wide upgrades to comply with the requirements of the ADA will be undertaken.

Contact Information
Eimon Smith
Los Angeles Unified School District
333 South Beaudry Ave, 21st floor
Los Angeles, CA 90017

213-241-3417

Location

Coordinates
34.1841°'"N 118.5385°'"W
Cities
Los Angeles, City of Los Angeles
Counties
Los Angeles
Cross Streets
18605 Erwin St
Zip
91335
Total Acres
21.5
Parcel #
2127-012-900
State Highways
101
Schools
numerous
Waterways
LA River flood control channel
Other Location Info
Reseda

Notice of Determination

Approving Agency
LA USD
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
333 South Beaudry Avenue, 21st Floor, LA, CA 90017

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search