Sherman Oaks Center for Enriched Studies (SOCES) Comprehensive Modernization

3 Documents in Project

Summary

SCH Number
2017111008
Lead Agency
Los Angeles Unified School District
Document Title
Sherman Oaks Center for Enriched Studies (SOCES) Comprehensive Modernization
Document Type
NOD - Notice of Determination
Received
Posted
5/9/2018
Present Land Use
Magnet school campus: PF-1XL-RIO
Document Description
The proposed project includes the construction of new classrooms, support spaces, a gymnasium, and a lunch shelter. The proposed project also includes improvements to existing school facilities. The proposed project also includes the demolition of seven portable structures and six permanent buildings, including the gymnasium building, transportation building, and four classroom buildings (#5, 7, 9, and 10), and one permanent structure, the lunch shelter. The auditorium building will be modernized and seismically retrofitted, and the existing administrative and counseling buildings will be upgraded and reconfigured. All existing buildings will be upgraded with new exterior paint and programmatic access improvements. Further, existing classrooms and adjacent interior corridors will also be upgraded with new interior paint, improvements to flooring systems, and upgraded permanent classroom fixtures. Finally, upgrades to the site infrastructure and utilities and various site-wide upgrades to comply with the requirements of the ADA will be undertaken.

Contact Information

Name
Eimon Smith
Agency Name
Los Angeles Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
18605 Erwin St
Zip
91335
Total Acres
21.5
Parcel #
2127-012-900
State Highways
101
Schools
numerous
Waterways
LA River flood control channel
Other Location Info
Reseda

Notice of Determination

Approving Agency
LA USD
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print