Canyon Estates Drive/Canyon View Drive Intersection Realignment Project

2 Documents in Project

Summary

SCH Number
2017111005
Lead Agency
City of Lake Elsinore
Document Title
Canyon Estates Drive/Canyon View Drive Intersection Realignment Project
Document Type
NOD - Notice of Determination
Received
Posted
2/28/2018
Present Land Use
roadway/none/roadway
Document Description
The project is the realignment and reconstruction of the intersection of Canyon Estates Drive and Canyon View Drive located within the City's Lake Elsinore Hills District. The realignment will allow for a standard signalized four-way intersection that will connect realigned Canyon Estates Drive with Franklin St. and the future Camino Del Norte extension (currently proposed under a separate project). Canyon View Drive will connect to Franklin St. as a stop-controlled intersection. Major components of the proposed project include demolition of existing roadways and removal fo demolished materials (asphalt, concrete, soils and vegetation); utility relocation (electrical power poles and water line blow-off valve); site preparation and grading; roadway, cub/gutter, sidewalk construction of existing drainage facilities and installation of a new triple 54 inch reinforced concrete pipe and ancillary facilities.

Contact Information

Name
Richard J. MacHott
Agency Name
City of Lake Elsinore
Contact Types
Lead/Public Agency

Location

Cities
Lake Elsinore
Counties
Riverside
Cross Streets
Canyon Estates Dr and Canyon View Dr
Zip
92532
Total Acres
3.12
Parcel #
363-540-002, -004
State Highways
I-15
Schools
Railroad Cyn ES
Waterways
San Jacinto River
Township
6S
Range
4W
Section
9
Base
SB

Notice of Determination

Approving Agency
Lake Elsinore City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.