New 7.5 MG Reservoir and Related Water System Improvements Project, Case Nos. Site Plan Review (SP-17-10) and CEQA Document (EAR-0056)

5 Documents in Project

Summary

SCH Number
2017111003
Lead Agency
City of Upland
Document Title
New 7.5 MG Reservoir and Related Water System Improvements Project, Case Nos. Site Plan Review (SP-17-10) and CEQA Document (EAR-0056)
Document Type
NOD - Notice of Determination
Received
Posted
12/22/2017
Present Land Use
LU: Vacant lot/dilapidated bldg; Z: Light industrial; GP: Light industrial/business park
Document Description
The city is proposing to add a new reservoir and appurtenances to an existing reservoir site, which already contains a 7.5 MG water storage reservoir that receives water from the Water Facilities Authority and related water system facilities. The new reservoir will be constructed to hold 7.5 MG of water, and will have an inside wall radius of 123 feet with a wall height of 26.5 feet. At a later date, the City will determine whether to rehabilitate/modify the existing reservoir or demolish the existing reservoir. The proposed site for the new reservoir is adjacent to and east of the existing Reservoir 15 and includes a single, partially developed lot. The lot is approx. 4.76 acres in a roughly rectangular shape, and it consists of mostly of bare ground. However, there are small areas of concrete, an abandoned concrete foundation, a dilapidated building, an existing irrigation reservoir, a gravel roadway, and other older improvements on the north and south portions of the site.

Contact Information

Name
Melecio Picazo
Agency Name
City of Upland
Contact Types
Lead/Public Agency

Location

Cities
Upland
Counties
San Bernardino
Cross Streets
17th St and Benson Ave
Zip
91786
Total Acres
4.76
Parcel #
1005-271-03
State Highways
I-210, 10
Airports
Cable Airport
Waterways
San Antonio Creek
Township
1N
Range
8W
Section
35
Base
SBBM

Notice of Determination

Approving Agency
City of Upland
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print