Operation of Golden State Water Company - Wrightwood Health Creek 7 Manganese Treatment Facility (Replacement)
Summary
SCH Number
2017108628
Public Agency
State Water Resources Control Board
Document Title
Operation of Golden State Water Company - Wrightwood Health Creek 7 Manganese Treatment Facility (Replacement)
Document Type
NOE - Notice of Exemption
Received
Posted
10/30/2017
Document Description
The State Water Resources Control Board (State Water Board) as the lead agency will be issuing a water supply permit. Golden State Water Company proposes to replace an existing 100 gallon per minute manganese treatment system with a new treatment system within an existing building. A 44,000 gallon backwash tank outside the building will also be replaced with also be replaced with a same size tank. Sludge from the backwash process will be hauled off a couple times per year. Piping will be replaced to connect the new system to the well. The project will occur on an 8,712 foot 2 existing fenced well and treatment site. The proejct will provide for the operation of the facilities.
Contact Information
Name
Tian-Ting Shih
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency
Phone
Location
Cities
Bakersfield
Counties
Kern
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15301, Class 1
Reasons for Exemption
Existing highways for the designation of reoutes and has no physical construction or modification of any kind.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.