City of Needles Upper System Upgrades for Fire Flow and Reliability Project (Project)
2 Documents in Project
Summary
SCH Number
2017108460
Public Agency
City of Needles
Document Title
City of Needles Upper System Upgrades for Fire Flow and Reliability Project (Project)
Document Type
NOE - Notice of Exemption
Received
Posted
4/23/2020
Document Description
The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board’s Drinking Water State Revolving Fund (SRF) Program is financing the Project. The Project includes construction a new pump station and replace approximately 150 feet of existing piping to update the current water supply infrastructure. Grading and other ground disturbance will occur within the current water system footprint. The purpose of the Project is to relieve bottle necking to the existing water tank and increase the booster pump water capacity.
Contact Information
Name
Bridget Binning
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency
Phone
Location
Cities
Needles
Counties
San Bernardino
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Class 2: Replacement or Reconstruction (Title 14, division 6, chapter 3, article 19, section 15302)
Reasons for Exemption
The Project has been determined to meet the requirements of the exemption(s) selected above and will not have a significant impact on water quality. The Class 2 exemption involves replacement/ reconstruction of existing structures or facilities on the same site having substantially the same purpose.
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.