Upland Plant 13, Reservoir 4, and Well 7A Tetrachloroethylene (PCE) Removal System

Summary

SCH Number
2017108425
Public Agency
State Water Resources Control Board
Document Title
Upland Plant 13, Reservoir 4, and Well 7A Tetrachloroethylene (PCE) Removal System
Document Type
NOE - Notice of Exemption
Received
Posted
10/20/2017
Document Description
The State Water Resources Control Board (State Water Board), as the responsible agency, will be issuing a water supply permit. Construction of the project was started in November 2016. Improvements were made to a 2,600 foot2, 10-foot tall, 200,000-gallon reservoir to install aeration treatment in order to help remove PCEs (Tetrachloroethylene) to meet MCL requirements. The tanks were coated with polyurethane, and new stainless steel screens were installed on the overflow pipe, intake pipe, and drainpipe.

Contact Information

Name
Eric Zuniga
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Upland
Counties
San Bernardino

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301 - C;ass 1
Reasons for Exemption
The operation of existing public utility structures involving no expansion of use beyond that existing at the time of the lead agency's determination.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print