Francisco Boulevard West Multi-Use Pathway

6 Documents in Project

Summary

SCH Number
2017102079
Lead Agency
City of San Rafael
Document Title
Francisco Boulevard West Multi-Use Pathway
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
public/quasi public
Document Description
The city proposes to construct approx 4,500 ft of a multi-use pathway within city and SMART row from Andersen Dr to the Mahon Creek pathway. The MUP would consist of an 8- to 10-ft paved pathway with associated 2-ft wide shoulders, a prefabricated bridge, drainage facilities, retaining walls, fencing, and other minor project elements (e.g. signage, pavement marking).

Contact Information

Name
Kevin McGowan
Agency Name
City of San Rafael
Contact Types
Lead/Public Agency

Location

Cities
San Rafael
Counties
Marin
Cross Streets
Francisco Blvd west, Andersen Dr, Rice Dr, Irwin St
Zip
94901
State Highways
101
Railways
SMART
Waterways
Mahon Creek
Township
1N
Range
6W
Base
SanRaf

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Transportation Projects, Cal Fire, California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Parks and Recreation, California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), Department of Water Resources, Office of Historic Preservation, Resources Agency, State Water Resources Control Board, Division of Drinking Water, California Department of Transportation, District 4 (DOT)
State Reviewing Agency Comments
California Department of Transportation, District 4 (DOT)
Development Types
Recreational (multi-use pathway)
Local Actions
Other
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print