Hallwood Side Channel and Floodplain Restoration Project on the Lower Yuba River

11 Documents in Project

Summary

SCH Number
2017102054
Lead Agency
Yuba County
Document Title
Hallwood Side Channel and Floodplain Restoration Project on the Lower Yuba River
Document Type
NOD - Notice of Determination
Received
Posted
4/26/2021
Document Description
Hallwood Side Channel and Floodplain Restoration, Phase III and IV (WCB Project ID:2021030). The core activity of the Project is the removal of large portions of the Middle Training Wall to create a healthier, more natural, and therefore, more productive river with subsequent fine-scale grading and revegetation. The Project will restore and enhance ecosystem processes with a primary objective of rehabilitating productive juvenile salmonid rearing habitat to increase natural production of fall-run and springrun Chinook salmon and California Central Valley (CCV) steelhead in the lower Yuba River.

Contact Information

Name
John P. Donnelly
Agency Name
Department of Fish and Wildlife, Wildlife Conservation Board
Contact Types
Responsible Agency

Location

Counties
Yuba
Other Location Info
The Hallwood Side Channel and Floodplain Restoration, Phases III and IV project (Project) occurs on two private aggregate mining operations north of, and contiguous with, the Yuba River eight miles northeast of Marysville in Yuba County.

Notice of Determination

Approving Agency
Wildlife Conservation Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Yuba
Final Environmental Document Available at
915 Eighth Street, Suite 123 Marysville, CA 95901

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.