Hallwood Side Channel and Floodplain Restoration Project
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2017102054
- Lead Agency
- Yuba County
- Document Title
- Hallwood Side Channel and Floodplain Restoration Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/15/2017
- Present Land Use
- EX-Extractive district; GP: Natural resources
- Document Description
- The 165-acre Hallwood Side Channel and Floodplain Restoration Project will reclaim the currently disconnected floodplain, rehabilitate side channels through the floodplain, reduce channel confinement, restore riparian vegetation, place large woody debris in the channel to provide cover from high flow velocities and predators for juvenile salmonids, and enhance rearing habitat by removing approx.. 3.1 million cubic yards of mining era sediment and placing approx. 122 thousand cubic yards of river rock and woody debris.
- Contact Information
-
Nicholas White
Central Valley Regional Water Board
11020 Sun Center Dr. #200
Rancho Cordova, CA 95670
Phone : (916) 464-4856
Location
- Coordinates
- 39°11'35"N 121°29'05"W
- Counties
- Yuba
- Cross Streets
- Hallwood Blvd/Walnut Ave
- Zip
- 95922
- Total Acres
- 165
- Parcel #
- 006-100-074
- State Highways
- 20
- Schools
- Cordua ES
- Waterways
- Yuba River
- Township
- 68N
- Range
- 4E
- Section
- 36
- Base
- MDB
- Other Location Info
- Hallwood
Notice of Determination
- Approving Agency
- Central Valley Regional Water Quality Control Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 11020 Sun Center Dr. #200, Rancho Cordova, CA 95670
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.