Water System Improvement Project (Lake or Streambed Alteration Agreement No. 1600-2018-0030-R2)
5 Documents in Project
Summary
SCH Number
2017102045
Lead Agency
Konocti County Water District
Document Title
Water System Improvement Project (Lake or Streambed Alteration Agreement No. 1600-2018-0030-R2)
Document Type
NOD - Notice of Determination
Received
Posted
5/29/2018
Present Land Use
water treatment plant intake and utility line
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2018-0030-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Konocti County Water District.
Project is limited to the replacement and extension of Konocti County Water District's (KCWD) raw water intake pipe and the replacement raw water pump station. The project includes the replacement of the existing six- and eight-inch intake pipes with 1,600 feet of 17-inch High Density Polyethylene (HDPE) pipe that will be constructed using horizontal directional drilling techniques. The project also includes the construction of a new 10-foot diameter by 30-foot deep wet well below a 20-foot by 44-foot pump station pad located approx. 20 feet east of the existing raw water pump station. Approx. ten temporary pilings will be installed during construction of the wet well. These pilings will be removed upon completion of construction. The intake pipe will be directly connected to the wet well at a depth below the intake screen, which will eliminate the need to rely on a syphon-based intake system. The intake screen will be floated into place via a barge and secured with four pilings. The intake screen is designed to meet an approach velocity of less than 0.33 feet per second. This project includes the removal of one 36-inch oak tree.
Contact Information
Name
Kelsey Vella
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Clearlake
Counties
Lake
Cross Streets
Ball Park Ave
Zip
95422
Total Acres
7.9
Parcel #
040-240-10
State Highways
53
Airports
Pearce Airport
Schools
3
Waterways
Clear Lake
Township
13N
Range
7W
Section
28
Base
MDBM
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.