Camino Safety Project
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2017102027
- Lead Agency
- Caltrans 3 (Marysville) (California Department of Transportation, District 3)
- Document Title
- Camino Safety Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/6/2018
- Document Description
- Caltrans proposes to improve safety on US 50 in the Camino corridor by installing a concrete median barrier that would restrict left-turn movements at at-grade intersections, widening the outside shoulders to standard width, and installing several acceleration/deceleration lanes to help reduce collisions within the project limits. The project is in El Dorado County on US 50 from PM 21.95 to PM 24.45. The total length of the project is approx 2.4 miles. Four build alternatives, alternatives 1C, 4.5C, and 4.7, are being considered. There is also a no-build alternative.
- Contact Information
-
Kristen Stubblefield
California Department of Transportation, District 3
703 B St
Marysville, CA 95901
Phone : (530) 741-5124
Location
- Coordinates
- 38°44'12.6"N 120°42'27.6"W
- Counties
- El Dorado
- Cross Streets
- US 50/Pondorado Rd, US 50/Upper Carson Rd
- Zip
- 95706
- Total Acres
- 103.862
- State Highways
- 50
- Airports
- Placerville
- Other Location Info
- Camino
Notice of Determination
- Approving Agency
- Caltrans
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 703 B Street, Marysville, CA 95901
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.