El Dorado Trail Extension - Missouri Flat Rd to the Town of El Dorado & Missouri Flat Rd Bike/Pedestrian Overcross

6 Documents in Project

Summary

SCH Number
2017102014
Lead Agency
El Dorado County
Document Title
El Dorado Trail Extension - Missouri Flat Rd to the Town of El Dorado & Missouri Flat Rd Bike/Pedestrian Overcross
Document Type
NOD - Notice of Determination
Received
Posted
12/20/2017
Document Description
The project includes the development of approx. 2.2 miles of an 8 feet wide paved Class 1 multi-use bicycle/pedestrian trail, with signage and a road crossing at Missouri Flat Rd. Proposed trial amenities may also include installation of fencing/railing and small culvert crossings. A bike/pedestrian overcrossing would be constructed of a prefabricated steel truss, and a 12-foot wide concrete deck with approaches to connect the existing El Dorado Trail at its existing terminus just east of Missouri Flat Rd. with the proposed trail west of Missouri Flat Rd. A pedestrian connection would be provided between the Class 1 trail and the sidewalk on the west side of Missouri Flat Rd.

Contact Information

Name
Donna Keeler
Agency Name
El Dorado County
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
Oriental St (northwest milepost 143) & Old Depot Rd (east of milepost 144)
Zip
95623
Total Acres
37
State Highways
49
Railways
Trail in rail corridor
Schools
Union Mine HS
Township
10N
Range
10E
Section
24,26,
Base
MDBM

Notice of Determination

Approving Agency
El Dorado County Board of Supervisors
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print