Salmon Lake Road Bridge (13C0053) over Church Creek Replacement Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2017102008
- Lead Agency
- Sierra County
- Document Title
- Salmon Lake Road Bridge (13C0053) over Church Creek Replacement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/27/2017
- Present Land Use
- Primary ag/general forest
- Document Description
- The Sierra County Dept of Public Works and Transportation, in conjunction with Caltrans and the Federal Hwy Administration, intends to replace the existing Salmon Lake Rd Bridge (13C0053) over Church Creek. The proposed 67-ft long, 27.3 ft wide outside to outside, single span bridge will be constructed on the existing alignment. The bridge has a Caltrans sufficiency rating of 61.4 and has a substandard load carrying capacity and inadequate bridge roadway geometry. The new bridge would improve roadway safety and be consistent with AASHTO guidelines.
- Contact Information
-
Tim H Beals
Sierra County
101 Courthouse Square PO Box 98
Downieville, CA 95936
Phone : (530) 289-3201
Location
- Coordinates
- 39°39'13.7"N 120°37'57.3"W
- Counties
- Sierra
- Cross Streets
- Salmon Lake Rd and Gold Lake Hwy
- Zip
- 95603
- Total Acres
- 1.76
- Parcel #
- 007-110-012
- Waterways
- Various
- Township
- 21N
- Range
- 12E
- Section
- 28
- Base
- MD
- Other Location Info
- Sierra City
Notice of Determination
- Approving Agency
- Sierra County
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 101 Courthouse Sq., Downieville, CA 95936
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.