Eastwood Recycled Water Pump Station Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2017101051
- Lead Agency
- Irvine Ranch Water District
- Document Title
- Eastwood Recycled Water Pump Station Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 1/23/2018
- Present Land Use
- Z: Medium density residential and designated medium density residential in general plan
- Document Description
- Project would ultimately house 14 pumps within one building and also include the installation of three surge tanks, installed slightly below grade, with a roof structure. The Project's purpose is to meet increasing demand in IRWD's Zone B and Zone C recycled water service areas, provide a high degree of operational flexibility, and to maximize the use of recycled water lines within the adjacent roadway, new recycled water lines within the adjacent roadway, storm water drainage infrastructure (e.g., curb and gutter), and installation of asphalt concrete for parking.
- Contact Information
-
Jo Ann Corey
Irvine Ranch Water District
15600 Sand Canyon Avenue
Irvine, CA 92718
Phone : (949) 453-5326
Location
- Coordinates
- 33°42'24.1"N 117°45'9.03"W
- Cities
- Irvine
- Counties
- Orange
- Cross Streets
- Jeffrey Rd and Irvine Blvd
- Zip
- 92620
- Total Acres
- 0.75
- Parcel #
- 551-711-15
- State Highways
- I-5, SR 133, 241
- Schools
- Stonegatre ES
Notice of Determination
- Approving Agency
- Irvine Ranch Water District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 15600 Sand Canyon Ave., Irvine, CA 92618
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.