Roosevelt High School Comprehensive Modernization Project

3 Documents in Project

Summary

SCH Number
2017101037
Lead Agency
Los Angeles Unified School District
Document Title
Roosevelt High School Comprehensive Modernization Project
Document Type
NOD - Notice of Determination
Received
Posted
5/9/2018
Present Land Use
School/public facilities

Document Description
The proposed project would include the demolition of temporary buildings and permanent buildings that have been determined to be structurally compromised beyond repair and/or aging; deteriorating; and which do not meet current educational requirements. The proposed project would include the construction of six new permanent structures (totaling approx. 236,000 sq. ft.) to replace those that would be demolished or removed. Site upgrades to campus infrastructure would also be implemented under the proposed project.

Contact Information
Ed Paek
Los Angeles Unified School District
333 South Beaudry Ave, 21st floor
Los Angeles, CA 90017

Phone : (213) 241-4676

Location

Coordinates
34°02'17.6"N 118°12'40.1"W
Cities
Los Angeles Los Angeles, City of
Counties
Los Angeles
Cross Streets
456 S. Mathews St
Zip
90033
Total Acres
22.7
Parcel #
5185-004-929
State Highways
5, 10, 101
Other Location Info
Boyle Heights

Notice of Determination

Approving Agency
LA USD
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
333 S. Beaudry Avenue, 21st Floor, LA, CA 90017

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print