New Gymnasium at Bert Lynn Middle School
Summary
- SCH Number
- 2017098109
- Lead Agency
- Torrance Unified School District
- Document Title
- New Gymnasium at Bert Lynn Middle School
- Document Type
- NOE - Notice of Exemption
- Received
- Posted
- 9/7/2017
- Document Description
- Torrance Unified School District proposes to construct a new gymnasium at Bert Lynn Middle School. The gymnasium would replace a portion of the turf playfields at the school. The design of the new 7,500-square-foot, 34-foot-tall gymnasium would be "boxy" and angular, and would have a concrete walkway around the perimeter of the building that would connect to existing campus walkways. The gymnasium would supplement that middle school's physical eduction program, and would not increase student capacity. construction activities are anticipated to start in January 2019, and the overall construction oduration is anticipated to last approximately 12 months.
- Contact Information
-
Tom Stowe
Torrance Unified School District
2335 Del Amo Plaza Blvd.
Torrance, CA 90501
Phone : (310) 972-6061
Location
- Cities
- Torrance
- Counties
- Los Angeles
Notice of Exemption
- Exempt Status
- Categorical Exemption
- Type, Section or Code
- 15303, 15314, Class 3 & 14
- Reasons for Exemption
- New Construction or Conversion of Small Structures; Minor Additions to Schools.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.