New Gymnasium at Bert Lynn Middle School

Summary

SCH Number
2017098109
Public Agency
Torrance Unified School District
Document Title
New Gymnasium at Bert Lynn Middle School
Document Type
NOE - Notice of Exemption
Received
Posted
9/7/2017
Document Description
Torrance Unified School District proposes to construct a new gymnasium at Bert Lynn Middle School. The gymnasium would replace a portion of the turf playfields at the school. The design of the new 7,500-square-foot, 34-foot-tall gymnasium would be "boxy" and angular, and would have a concrete walkway around the perimeter of the building that would connect to existing campus walkways. The gymnasium would supplement that middle school's physical eduction program, and would not increase student capacity. construction activities are anticipated to start in January 2019, and the overall construction oduration is anticipated to last approximately 12 months.

Contact Information

Name
Tom Stowe
Agency Name
Torrance Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Torrance
Counties
Los Angeles

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15303, 15314, Class 3 & 14
Reasons for Exemption
New Construction or Conversion of Small Structures; Minor Additions to Schools.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print