Point Isabel Water Access and Shoreline Restoration (Lake or Streambed Alteration Agreement No. 1600-2017-0481-R3)

4 Documents in Project

Summary

SCH Number
2017092071
Lead Agency
East Bay Regional Parks District
Document Title
Point Isabel Water Access and Shoreline Restoration (Lake or Streambed Alteration Agreement No. 1600-2017-0481-R3)
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2018
Present Land Use
open space/OS/OS
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0481-R3, pursuant to section 1602 of the Fish and Game Code to the project applicant, the East Bay Regional Parks District, as represented by Jeff Rasmussen. Under the terms of the Agreement, the Project is limited to levee remediation along the southern side of Hoffman Channel. Work will be conducted from the landward side and existing shoreline riprap will be left in place. All disturbed areas will be reseeded with native vegetation upon Project completion. The project will not increase the sq. footage of riprap along the shoreline band, as new materials will be placed on top of existing riprap.

Contact Information

Name
Alison Furler
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Richmond
Counties
Contra Costa
Cross Streets
Access Road from Central Ave along Isabel St, or from Central Ave along Rydin Rd
Zip
94804
Total Acres
4.5
Parcel #
560-010-035, -400-008
State Highways
580, 80
Schools
Nomura PS
Waterways
SF Bay

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print