Fitch Mountain Park and Open Space Preserve Improvement (Lake or Streambed Alteration Agreement No. 1600-2019-0108-R3)

4 Documents in Project

Summary

SCH Number
2017092062
Lead Agency
City of Healdsburg
Document Title
Fitch Mountain Park and Open Space Preserve Improvement (Lake or Streambed Alteration Agreement No. 1600-2019-0108-R3)
Document Type
NOD - Notice of Determination
Received
Posted
8/7/2019
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2019-0108-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, City of Healdsburg. The project is limited to trail improvement and new trail construction, repair of a steeply eroding gully and repair of two erosive head-cuts through installing rock riprap in the channels, and the construction of two 5-foot by 17-foot footbridges over the existing head-cuts to be repaired . Each footbridge will span a separate channel with abutments above top of bank. Invasive species will be removed in the riparian corridor and native riparian plants will be used to restore the area.

Contact Information

Name
Jaime Licea
Agency Name
City of Healdsburg
Contact Types
Lead/Public Agency

Name
Agency Name
City of Healdsburg
Contact Types
Project Applicant

Location

Cities
Healdsburg
Counties
Sonoma
Cross Streets
908 Chanticleer Way, Healdsburg CA
Other Location Info
multiple unnamed tributary to the Russian River, in the County of Sonoma.

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print